What It Costs to Open a Laundromat From Scratch
There is no credible published figure for the cost to open a laundromat, and this page will not invent one. The number is driven by store size, machine count, and how much laundry infrastructure the space already has — variables that move it by multiples. What follows is how to build a real estimate from quotes.
Key takeaways
- The ranges circulating online are marketing estimates, not survey data. Treat them accordingly.
- What the space already has dominates the build-out line. An existing laundry and a bare retail shell are different projects.
- Working capital through the ramp is the most underestimated line, and the most common cause of failure.
- Compare against buying. The median laundromat sold for $250,000 with customers and permits already in place (Source: BizBuySell, 2021-2025).
Why Will Nobody Give You a Number?
Because the honest answer is a range so wide it stops being useful, and the reason is the site.
A space that previously operated as a laundromat may already have the water service, the sewer capacity, the gas supply, the ventilation and the floor drainage. A bare retail shell has none of them, and installing them is construction rather than fit-out — potentially including a utility upgrade that requires the utility's own timetable and its own cost.
The second driver is scale. The Coin Laundry Association's 2024 survey of owner-operators reported a median store of 2,740 square feet with 62 machines producing $335,000 of gross revenue (Source: CLA, 2024). A store half that size and a store twice it are entirely different capital projects.
Anyone quoting a single figure without seeing your site and your equipment list is guessing, and the guess is usually low.
What Are the Lines?
Build the estimate from quotes against this structure. Every line needs a real number from a real supplier before the project is fundable.
| Line | What drives it | Who quotes it |
|---|---|---|
| Equipment | Machine count, capacity mix, brand, controls | Distributor — see equipment package |
| Equipment installation | Plumbing, gas, electrical connections per machine | Distributor or contractor |
| Water heating plant | Peak demand, recovery rate, fuel type | Mechanical contractor |
| Plumbing and drainage | Existing infrastructure versus new | Plumbing contractor |
| Gas service and train | Dryer BTU load, existing supply | Utility plus contractor |
| Electrical service | Panel capacity, machine load | Electrician plus utility |
| Ventilation and make-up air | Dryer exhaust volume | Mechanical contractor |
| Floor, walls, ceiling | Condition, drainage slope, finishes | General contractor |
| Restroom and ADA compliance | Current standards apply to new work | Architect and contractor |
| Payment system | Coin, card, app, kiosk | Vendor |
| Signage and exterior | Landlord and municipal rules | Sign company |
| Permits and professional fees | Jurisdiction, scope, drawings | See permitting timeline |
| Utility deposits and connection fees | Utility policy, capacity charges | Each utility |
| Working capital and ramp funding | Months to breakeven | Your own model |
The last row is not a cost of construction, which is exactly why it gets left out. It is the cost of staying open until the store earns its way.
Which Lines Get Underestimated?
The utility capacity. Bringing a larger water service or a heavier gas supply to a building is not a line item you can negotiate down — the utility sets the cost and the timetable, and it can be substantial. Establish it before signing a lease, not after. See utility capacity.
Make-up air. Dryers exhaust a large volume and the building has to replace it. This is routinely missed in conversions and it is a mechanical design problem, not an afterthought.
Permitting time. Time is money when rent is running. See permitting timeline.
The ramp. A new store opens with no customers. Rent, utilities, insurance and any payroll run at full rate from day one while revenue climbs. See the ramp-up period.
Contingency. Construction on an existing building finds things. A project without a genuine contingency line is a project that will need more money at the worst moment.
How Does This Compare With Buying?
This is the comparison that matters, and it usually favors buying.
The median laundromat sold for $250,000 on median owner earnings of $76,560, across 855 reported transactions (Source: BizBuySell, 2021-2025). That price buys a store that is already trading, already permitted, with an established customer base and — critically — revenue history you can verify before you commit.
A new build starts from zero on all four. It also carries execution risk that an acquisition does not: the permits might take longer, the utility upgrade might cost more, and the location might turn out not to work.
Where building genuinely wins is where no acceptable store is for sale in a market you have researched, where you can secure a site with existing infrastructure at a favorable lease, or where you want a specific configuration nobody is selling. See buying vs building.
How Should You Sequence the Estimate?
- Find a candidate site and establish what it already has.
- Get the utility answers in writing before committing to the space.
- Get a distributor's equipment quote against a specific machine list.
- Get a contractor's build-out quote against actual drawings.
- Get the permit list and fee schedule from the building department.
- Model the ramp and size working capital from it.
- Add contingency, then compare the total against what an existing store would cost.
Doing step seven honestly is what separates people who open a good store from people who open an expensive one.
What Should You Not Do?
Do not budget from an online figure. The ranges published by equipment sellers and lenders are marketing, and they are systematically optimistic about the site.
Do not sign a lease before the utility answers arrive. This is the single most expensive sequencing error available in this project.
Do not buy the equipment first. Machine selection follows the space and the utility capacity, not the other way round.
Do not fund construction and leave the ramp unfunded. A finished store with no working capital is a store that closes in month eight.
Which Costs Do First-Time Builders Underestimate?
Five, consistently, and together they account for most of the gap between a plan and a project.
The shared infrastructure. Equipment quotes cover equipment. They do not cover upsizing a water service, a gas line or the electrical supply, building ductwork to meet the dryers' airflow specification, or the floor work higher-extraction machines require. Any of these can rival the equipment cost, and all of them are established by asking, not by assuming.
Professional fees. Architect, engineer, expediter where used. These usually exceed the municipal permit fees, and skimping produces plan-check comments that cost more in delay than the saving.
Rent during construction and permitting. This is the single largest omission. Rent runs from whenever the lease says it does, and a permitting period measured in months is a period of paying for a space that earns nothing. It is also the cost most within your control — through rent commencement tied to opening, not to possession.
Working capital and the ramp. A new store opens at zero and earns customers one at a time. Rent, utilities, insurance, loan payments and your own living costs run in full from day one. That gap has to be funded before opening, because a store cannot borrow its way through a ramp nobody budgeted for.
Contingency. Not a line most people include, and the one that determines whether a surprise is a problem or a crisis.
The pattern is that the underestimated items are the ones nobody quotes you for. Equipment and construction arrive with numbers attached. The rest has to be asked about.
How Should You Build the Estimate?
In an order that lets the expensive discoveries happen before you are committed.
Establish the site's capacity first, before any design work. Water service size, sewer basis and any capacity or impact charge, gas supply and meter, electrical service. These are phone calls to the utilities, and any one of them can rule a space out or add a large number to the project. Doing this before signing a lease is the difference between choosing a site and being stuck with one.
Then get the permitting picture. Call the building department about the address: what approvals apply to a change of use, how fees are calculated, how long plan review takes, and what triggers a new certificate of occupancy.
Then design, and get contractor pricing against real drawings instead of a concept.
Then price the equipment package against a settled machine list, from several distributors, with exclusions in writing — delivery, rigging, connection, commissioning, disposal, training.
Then add the money items: rent through construction and permitting, working capital, the ramp funding, and a contingency.
Two rules that save projects. Do not sign a lease before the capacity questions are answered, because the answers change what the space is worth. And fund the gap for materially longer than your plan assumes — a build that opens ahead of budget leaves you holding cash, while one that runs long with no reserve leaves you selling under pressure.
What Should You Not Do?
Four things, and each is a common way a viable project becomes an unviable one.
Do not sign a lease before the capacity answers are in. Water service, sewer basis and any capacity charge, gas supply and meter, electrical service. Any one of them can add a large number or rule the space out, and all are established by phone calls that cost nothing.
Do not budget from somebody else's project. Costs here are local — rates, fees, labour, and what the specific building already has. A figure from a build in another market is not a budget.
Do not fund the opening and forget the ramp. A new store earns customers one at a time while rent, utilities, insurance and loan payments run in full. That gap is the most common reason a well-built store fails, and it has to exist as cash before you open.
Do not skip the contingency. Not because something might go wrong, but because on a project with this many dependencies something will, and the question is only whether it is a problem or a crisis.
Summary
No single number answers this, because the site drives the cost more than the equipment does. Build the estimate line by line from real quotes, establish the utility position before signing anything, and fund the ramp as deliberately as the construction. Then compare the total against the median $250,000 an existing store sold for — with its customers, permits and provable revenue already in place.
The document a lender reads these numbers in is covered in writing a laundromat business plan.
The Next Step If You Are Looking to Buy
Frequently Asked Questions
How much does it cost to open a laundromat?
There is no credible published figure, and the ranges circulating online are marketing estimates rather than survey data. The cost is dominated by three variables — store size, machine count and mix, and how much the space already has — and those move the number by multiples, not percentages. Build the estimate line by line from real quotes.
Why will nobody give a straight number?
Because a straight number would be wrong. A space with existing laundry infrastructure and a space needing new water service, gas supply and a floor drain system differ by more than the equipment costs. Anyone quoting a single figure without seeing the site is guessing.
Is building cheaper than buying?
Rarely, and that is the more useful comparison. The median laundromat sold for $250,000 across 855 reported transactions (Source: BizBuySell, 2021-2025) — with an existing customer base, permits already granted, and revenue you can verify. A new build has none of those and takes time to earn them.
What is the biggest line?
Equipment, usually, followed by the build-out where the space is not already a laundry. The line most often underestimated is not either of those — it is working capital plus the months of below-breakeven trading while a new store builds a customer base.
How much working capital do I need?
Enough to cover fixed costs through the ramp, which is measured in months rather than weeks. Rent, utilities, insurance and any payroll run in full from day one while revenue climbs from zero. Underfunding this is the most common way a well-built new store fails.
Can SBA financing cover a new build?
SBA programs can fund startups and construction in some circumstances, with different requirements than an acquisition — start-up loans generally face a larger equity requirement and closer scrutiny of projections. Confirm the current terms with a lender rather than assuming acquisition rules apply.
Sources
- Coin Laundry Association, 2024 Laundry Industry Survey (377 owner respondents, 2023 operations) — https://member.laundryassociation.org/hubfs/IndustrySurvey24.pdf
- BizBuySell, Laundromat and Coin Laundry Valuation Benchmarks, 2021-2025 closed sales — https://www.bizbuysell.com/learning-center/valuation-benchmarks/laundromats-coin-laundry/
- U.S. Small Business Administration, 7(a) loan program — https://www.sba.gov/funding-programs/loans/7a-loans
This page is general information about laundromat transactions, not legal, tax, or investment advice, and not a guarantee of sale price, timing, or financing approval. Verify current rules with your own CPA, attorney, lender, and the relevant state or municipal agency before acting.